top of page
MI CINE CINÉPOLIS
Turnkey Project [Design, Engineering and Construction]
Awards:
1st monolithic casted wall with a height of 10 meters in Mexico and Latin America.
Construction time: 8 weeks.
Sqm of construction: 1,800 sqm.
Description: Made with metal formwork in Record Time . It consists of 7 movie theaters with concrete walls up to 10 meters high casted in a single pour on a parking slab and without cold joints, creating a monolithic structure of reinforced concrete with precast mesh; Flowable Fill and CLSM Concrete, with integrated color and anti-termite additive.

Encofrado

Escala

Perspectiva Áerea

Encofrado
1/4
bottom of page