top of page

GNP STADIUM

Turnkey Project [Design, Engineering and Construction]

 

Awards:

1st Professional Stadium in Mexico & Latin America.

Construction time: 5 months.

Sqm of Construction: 10,000 sqm.

Capacity: 5,000 spectators.

 

Description: Monolithic reinforced concrete structure in the bleachers area, built on a foundation of reinforced concrete piles with tie beams, connected to the main building of 18 meter high, with 4 operating levels and 34 Suites supported by precasted concrete elements in cantilever tensioning.

© 2023 made by SYTEC.

bottom of page